KeystoneMold
2026-11-06 · Leon Wang · ~7 min read

What to Include in a Mold Component RFQ (Checklist + Template)

Most mis-made mold components are communication errors. This checklist is built from the gaps we see when reviewing drawings.

← All insights
TL;DR
  • An accurate quote needs seven things: drawing or 3D model, material, hardness/heat treatment, surface treatment, critical tolerances, quantity, and required date.
  • For ejector pins and sleeves, add the fit to the bore (or the core pin size for a sleeve). For guide pins and bushings, add the mating part.
  • Tell the supplier if the mold is down. A rush RFQ is quoted differently.
  • Missing information isn't a problem if the supplier asks. It becomes a problem when they guess.

Why RFQs go wrong

Most mis-made mold components aren't machining errors. They are communication errors: a hardness that was never specified, a nitrided pin quoted as through-hardened, a sleeve bore ground to nominal without knowing the core pin, or a "standard" part that was standard in a different catalogue. Each one costs a re-make and a week or two — usually when the mold is already waiting.

When we review drawings at KeystoneMold, the same gaps come up again and again. This checklist is built from those gaps.

The core checklist (every component)

#ItemWhy it mattersExample
1Drawing (PDF) and/or 3D model (STEP, IGES, DWG)2D carries tolerances; 3D carries geometryEP-104_rev B.pdf + .step
2Revision levelAvoids making last year's versionRev B, 2026-10-12
3Material gradeDrives price, lead time and failure modeSKD61 (H13), SKH51, SUJ2, P20, 718H, S136
4Hardness / heat treatmentMost frequently missing itemNitrided ≥900 HV surface; or HRC 50–55 through-hardened
5Surface treatment / coatingAdds days and changes dimensions slightlyGas nitriding, DLC, none
6Critical tolerancesWhich features need grinding and CMMShaft Ø6 g6; length +0.1/0
7Surface finish on working facesAffects galling and appearanceRa 0.2 µm on sliding diameter
8Quantity per part numberUnit price and process choice4 pcs now; ~40/yr
9Required date (and why)Lets the supplier say honestly whether it's possibleShip by Nov 20 — mold down
10Standard / catalogue referenceFast way to define a "standard" partDIN 1530 / ISO 6751; MISUMI-/HASCO-/DME-type
11Inspection / report requirementSets expectations before productionCMM inspection report requirements confirmed per order; FAI on first lot
12Marking, packing, labelingAvoids rework at receivingLaser-mark part no.; bag per pin
13Shipping terms and addressAffects price and transitExpress to Ohio; importer of record = buyer

Extra items by component type

Ejector pins — type (straight, stepped, flat, custom tip); shaft diameter × length; fit to the ejector bore; head type and thickness; whether the tip is contoured. Resin and mold temperature help sanity-check the steel. See custom ejector pins.

Ejector sleeves — bore × OD × length; core pin diameter and its tolerance (or order the core pin with the sleeve); clearance on bore and OD; concentricity if tighter than standard. See ejector sleeves.

Core pins and insert pins — which end is the molding surface; polish requirement; venting; cooling holes; draft.

Guide pins and bushings — mating part; bushing type (oil groove, self-lubricating graphite, plain); mold temperature. See guide pins and guide bushes.

Plates, blocks and large parts (up to ~900 mm) — flatness and parallelism; steel condition; holes that must be ground or jig-located; weight and packing for shipping.

Copy-paste RFQ template

Subject: RFQ – [part type] – [your company] – qty [n] – need by [date]

1. Files attached: [drawing PDF + STEP], revision [ ]
2. Part number(s): [ ]  Standard/catalogue ref: [ ]
3. Material: [ ]   Hardness/heat treatment: [ ]
4. Surface treatment/coating: [ ]
5. Critical tolerances: [list features + tolerance]
6. Surface finish on working faces: [ ]
7. Quantity: [now] / [annual estimate]
8. Required ship date: [ ]   Mold down? [yes/no]
9. Inspection report needed: [CMM inspection report requirements confirmed per order / FAI / other]
10. Marking & packing: [ ]
11. Ship to: [city, state]   Importer of record: [ ]
12. Resin & mold temperature (optional, helps material check): [ ]
Contact for technical questions: [name, email, phone]

What a good supplier sends back

A supplier who has really read your RFQ should come back with either questions or a quotation that repeats your requirements in its own words — steel, hardness, tolerance, surface treatment, quantity, ship date and payment terms. If the quote only says "as per drawing," ask them to spell it out. At KeystoneMold we reply within one business day with questions or a short DFM note. Parts are made at our Dongguan factory, DongGuan CT Mould. Inspection report requirements are confirmed per order (see a sample).

Common RFQ mistakes

FAQ

Can I send an RFQ without a drawing?

For catalogue-type parts, a standard and part number is often enough. For anything custom, a drawing or 3D model is needed; a photo plus key dimensions can start the conversation, and the supplier should tell you what is missing.

What file formats should I send?

PDF for the 2D drawing, plus STEP or IGES for 3D. DWG is also widely accepted.

How do I specify hardness for a nitrided pin?

State the surface hardness (e.g. ≥900 HV) and, if it matters, the core hardness or base steel condition. "HRC 60" alone is ambiguous for a nitrided SKD61 pin.

Should I include the annual quantity even for a small order?

Yes. It helps the supplier decide whether to keep steel on hand or set up a repeatable process, which can shorten future lead times.

How quickly should I expect a quote?

For simple components, one to two business days is reasonable. Complex parts or large plates can take longer if engineering questions come up. At KeystoneMold we reply within one business day with questions or a short DFM note.

Does KeystoneMold have a minimum order?

One piece for standard sizes; custom parts are quoted per drawing. For a new customer we can make one free sample when appropriate.

Do you claim quality certifications you do not hold?

No. We do not claim certifications we do not hold. Inspection report requirements are confirmed per order.

About the author
Leon Wang, CEO & Technical Director, KeystoneMold LLC.