When you buy a mold component from a new supplier, the inspection report is the only document that tells you whether the part matches the drawing. Most buyers glance at it and file it. It deserves five minutes.
First: is it a report or a certificate?
| Document | What it contains | What it proves |
|---|---|---|
| Certificate of conformity | A statement that the part conforms | That someone signed a form |
| Dimensional report | Nominal, tolerance, measured value, per position | What was measured and what it was |
Ask for the second one. If a supplier cannot produce actual measured values, they are not inspecting — they are certifying.
What to check, in order
1. The instrument column
A good report names the instrument per position: micrometer, height gauge, plug gauge, projector, CMM. If every row says “caliper” and the tolerance is 0.005 mm, the report is decorative. A caliper does not resolve 0.005 mm.
2. Whether the values look measured
Real measurements scatter. If twenty positions all read exactly the nominal value — 20.000, 20.000, 20.000 — nobody measured anything.
Measured values look like this: 20.003, 19.998, 20.001, 19.996. That scatter is the signature of a real instrument.
3. The decimal places
A tolerance of ±0.01 mm should be reported to three decimals. Reporting 156.5 for a ±0.03 mm tolerance hides where in the band the part sits. Three decimals means the instrument and the person both had resolution to spare.
4. Failures and disposition
The most informative thing on a report is a position that failed, and what the supplier did about it. A report with no failures ever is either a perfect process or an edited document.
What you want to see: the failure shown, and a note — reworked, re-ground, remade, or accepted by deviation with your agreement. A supplier who hides a failure will hide the next one.
5. Who signed
Two names, not one: the inspector and the person approving quality. One signature means no independent check.
A worked example
Here is what our reports look like in practice. Six positions, four pieces, one row per position:
| Pos | Nominal | Tolerance | #1 | #2 | Result | Instrument |
|---|---|---|---|---|---|---|
| 1 | 156.50 | ±0.03 | 156.510 | 156.508 | OK | Height gauge |
| 2 | 9.50 | ±0.03 | 9.500 | 9.498 | OK | Height gauge |
| 3 | 40.00 | ±0.03 | 39.995 | 39.992 | OK | Height gauge |
Note that the measured values scatter within a few microns, the decimals match the tolerance, and the instrument is named per position. That is what a real report looks like.
You can open the full version here: sample inspection report (customer name withheld).
What to do when a position fails
Do not reject the whole batch automatically. Ask three questions:
- Is the feature functional? A non-critical clearance dimension slightly out of band may be irrelevant. A sealing face is not.
- Can it be reworked? Undersize on a ground face can sometimes be corrected by re-grinding to the next size, if the design allows.
- Who pays? Rework and remakes are the supplier's cost. Deviation acceptance is your decision, in writing, and usually comes with a price adjustment.
The purpose of a report is not to prove perfection. It is to make the conversation about facts instead of trust.
Add this to your RFQ
One sentence in the enquiry changes the whole relationship:
“Please confirm that each batch ships with a dimensional report showing nominal, tolerance, measured value and instrument per position, signed by the inspector and by quality.”
A supplier who can meet it will answer immediately. A supplier who cannot will negotiate — and you have learned something before placing the order.
Questions
Do I need a report for standard parts?
For standard catalogue items, a dimensional report on a sample batch is normally enough. For custom features and functional dimensions, ask for per-piece values.
What does a CMM report cost?
On critical parts, nothing extra — it is part of the process. On high-volume standard parts, a per-piece CMM report adds cost and is usually replaced by sampling plus a report on the first piece.
Can a supplier refuse to show failures?
They can, but it tells you what you need to know. A report that never shows a failure across many batches is not a sign of quality — it is a sign of editing.